Saturday, June 9, 2007

Nice day at the lake

Today we went out to lake to see how things were progressing. Although they are behind because of all the rain, it was still fun to see the basement walls up and the basement framing almost done. Next week (if there is no rain!) the plan is to move very quickly. The deck will go on, framing on the main floor and hopefully also the roof by Friday. At the same time that is happening, the final backfill will be done and the septic will be dug in. Soooo, please pray for the storms that are threatening to happen next week to stay away from South Haven! After the roof is done we don't care how much it rains
Dan standing at ground level of the first floor close to where the front step will be
View from the boat looking back at the construction (with a crane down by the water - see! so many wildlife animals!)
Driveway view of the floor trusses ready to be laid next week

If everything goes well we will go back out next Saturday and take more pictures. I'm sure it will be very different if the main floor and roof is up!

No comments: